A project in which the scope, time, and cost of delivery are determined as early as possible is following a life cycle that is:

Posted by: Pdfprep Category: PMI-001 Tags: , ,

A project in which the scope, time, and cost of delivery are determined as early as possible is following a life cycle that is:
A .  Adaptive
B .  Predictive
C .  Incremental
D .  Iterative

Answer: B