As indicated in the exhibit, which two actions will correct the cabling?

Posted by: Pdfprep Category: NS0-591 Tags: , ,

Refer to the exhibit.

You have just cabled a new shelf to a FAS8200. Running the system node run -node * sysconf ig -a command indicates that multipath HA is configured.

However, after running Config Advisor, you receive an error that your cabling is incorrect.

As indicated in the exhibit, which two actions will correct the cabling? (Choose two.)
A . Move the Ob SAS connection on the bottom controller to Od on the bottom controller.
B . Move the Ob SAS connection on the top controller to Od on the top controller.
C . Move the Ob SAS connection on the top controller to Od on the bottom controller.
D . Move the Ob SAS connection on the bottom controller to Od on the top controller.

Answer: AB

Leave a Reply

Your email address will not be published.