Which four actions should you perform in sequence?

Posted by: Pdfprep Category: AZ-400 Tags: , ,

DRAG DROP

You have an Azure subscription that contains a resources group named RG1.

RG1 contains the following resources:

• Four Azure virtual machines that run Windows Server and have Internet Information Services (IIS) installed

• SQL Server on an Azure virtual machine

• An Azure Load Balancer

You need to deploy an application to the virtual machines in RG1 by using Azure Pipelines.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the List of actions to the answer area and arrange them in the correct order.

Answer:

Leave a Reply

Your email address will not be published.