A company needs to maintain and verify backups at a secondary site to meet the following requirements: RTO of two hours, RPO of 12 hours, four weeks retention.

Which of the following backup copy job configurations meets these requirements?
A . Periodic backup copy job, scheduled for a two-hour interval, with 56 restore points to retain
B . Periodic backup copy job, scheduled for a 12-hour interval, with 56 restore points to retain
C . Periodic backup copy job, scheduled for a two-hour interval, with 112 restore points to retain
D . Periodic backup copy job, scheduled for a 12-hour interval, with 112 restore points to retain

Answer: C