PdfPrep.com

Which of the following steps allow you to create a test system (system A) based on a productive SAP HANA standalone system (system B)? (Choose two.)

Which of the following steps allow you to create a test system (system A) based on a productive SAP HANA standalone system (system B)? (Choose two.)

A. Copy the data and log volume files from system B to system A.

B. Export the data from system B to a file share and import the data to system A.

C. Copy a snapshot from system B to system A.

D. Restore a complete database backup from system B to system A.

Answer: AD

Exit mobile version