Which two configurations need to be set up?

Posted by: Pdfprep Category: FSL-201 Tags: , ,

Universal Containers schedules jobs that require multiple steps when on-site. They would like to add a new status to the existing status flow.

Which two configurations need to be set up? Choose 2 answers.
A . Add the allowed Status Transitions in Field Service Settings.
B . Add new Status to the Work Order
C . Add the Status Transitions to the Technicians’ Profile.
D . Add new Status to the Service Appointment.

Answer: C,D