PdfPrep.com

Cluster Operations Jobs can be configured to have a sequence of operations. When one of these operations fails, how do you control the effect of that failure on the rest of the Ouster Operations flow?

Cluster Operations Jobs can be configured to have a sequence of operations. When one of these operations fails, how do you control the effect of that failure on the rest of the Ouster Operations flow?
A . It is not possible to control the effect of an operation failure. The build fails immediately.
B . Set the "Failure Mode" in the advanced options in a Ouster Operations Job configuration.
C . Create a Freestyle Job that listens to the build result of a Ouster Operations build and then dynamically sets the "Failure Mode".
D . With the CloudBees Monitoring plugin installed, configure an "Alert" In Jenkins global configuration (Manage Jenkins -> Configure System).

Answer: A

Exit mobile version