Cluster Operations Jobs can be configured to have a sequence of operations. When one of these operations fails, how do you control the effect of that failure on the rest of the Ouster Operations flow?

Posted by: Pdfprep Category: CCJE Tags: , ,

Cluster Operations Jobs can be configured to have a sequence of operations. When one of these operations fails, how do you control the effect of that failure on the rest of the Ouster Operations flow?
A . It is not possible to control the effect of an operation failure. The build fails immediately.
B . Set the "Failure Mode" in the advanced options in a Ouster Operations Job configuration.
C . Create a Freestyle Job that listens to the build result of a Ouster Operations build and then dynamically sets the "Failure Mode".
D . With the CloudBees Monitoring plugin installed, configure an "Alert" In Jenkins global configuration (Manage Jenkins -> Configure System).

Answer: A