After the staging begins, which rule determines when the staging process ends?

Posted by: Pdfprep Category: e20-593 Tags: , ,

A Dell EMC NetWorker server has been configured to stage from an AFTD upon reaching a high water mark of 80%.

After the staging begins, which rule determines when the staging process ends?
A . All save sets over a specified size are moved
B . All save sets older than the “max storage period” are moved
C . Capacity used falls to any point below the high water mark
D . File system utilization reaches the low water mark

Answer: D