Before starting provisioning operations in Hitachi Device Manager, what are three requirements? (Choose three)

Posted by: Pdfprep Category: HAT-680 Tags: , ,

Before starting provisioning operations in Hitachi Device Manager, what are three requirements? (Choose three)
A . The host must be physically connected to the SA
C . The port on the storage system must be configured.
D . Any world-wide node name (WWNN) must be configured for the host.
E . The host must appear in the host view.
F . The switch must be added to Device Manager.

Answer: A,B,D

Leave a Reply

Your email address will not be published.