What is the most probable cause for these errors?

Posted by: Pdfprep Category: 1D0-621 Tags: , ,

Thomas and his web design team hurried to complete a 1,000 page data driven web site to meet and exceed the customer’s expectation of delivery of a final project. Upon final testing of the site with the customer, Thomas discovered several of the features on the site did not work or provided inaccurate results. A great deal of time is required to go back and correct the mistakes.

What is the most probable cause for these errors?
A . Data driven web sites are best suited for smaller sites and may cause errors in larger projects.
B . The team failed to build and test a prototype of the site early on in the project.
C . The customer had set unrealistic expectations that could not be met by the design team.
D . The wireframe of the project was modified throughout the project creation, causing inconsistencies.

Answer: D