What steps are needed to verify the transfer?

Posted by: Pdfprep Category: H13-629_V2.0-ENU Tags: , ,

The Redhat Linux Enterprise 6 cp command is used to complete the operating system data migration.

What steps are needed to verify the transfer? (Multiple choice.)
A . Check if the size of the migrated file is the same as the original data.
B . Check if the number of documents corresponds to the original data
C . Check if each file with read and write permissions corresponds to the original data
D . Whether the time for reviewing the case file corresponds to the original data.

Answer: A,B,C