Your consulting firm has recently been hired to complete a site survey for a company. Your engineers use predictive design software for the task, but the company insists on a pre-deployment site visit.
What task should be performed as part of the pre-deployment visit to prepare for a predictive design?
A . Evaluate the building materials at ABC’s facility and confirm that the floor plan documents are consistent with the actual building
B . Install at least one AP on each side of the exterior walls to test for co-channel interference through these walls
C . Test several antenna types connected to the intended Aps for use in the eventual deployment
D . Collect information about the company’s security requirements and the current configuration of their RADIUS and user database servers
Answer: A