When cabling the controller to the shelves, where does the host port on the last shelf in the chain get connected?

Posted by: Pdfprep Category: E20-385 Tags: , ,

You are installing an EMC Data Domain system with two expansion shelves in a customer-provided rack.

When cabling the controller to the shelves, where does the host port on the last shelf in the chain get connected?
A . Expansion port of the upstream shelf
B . Expansion port of the controller
C . Last port is left un-cabled
D . Host port of the controller

Answer: A

Leave a Reply

Your email address will not be published.