Which action allows the interconnection?

Posted by: Pdfprep Category: 300-630 Tags: , ,

Refer to the exhibit.

An engineer extends a Cisco ACI Multi-Pod setup to a Cisco ACI Multi-Site implementation.

Which action allows the interconnection?
A . Configure BIDIR-PIM in the IPN and ISN
B . Use dedicated uplinks on Site 1 spines for ISN connections
C . Connect all spines to the IPN and ISN
D . Filter the advertisement of the Site 2 TEP pool into the IPN

Answer: A

Leave a Reply

Your email address will not be published.