Which correction allows for a more efficient design?

Posted by: Pdfprep Category: 300-320 Tags: , ,

Refer to the exhibit.

An engineer must provide a redesign for the distribution and access layers of

the network.

Which correction allows for a more efficient design?
A . Change the link between Distribution Switch A and Distribution Switch B to be a routed link.
B . Reconfigure the Distribution Switch A to become the HSRP Active.
C . Create an EtherChannel link between Distribution Switch A and Distribution Switch
E . Add a link between Access Switch A and Access Switch

Answer: B

Leave a Reply

Your email address will not be published.