Which of the following should be proposed to add the additional resources at the lowest cost?

Posted by: Pdfprep Category: C1000-031 Tags: , ,

A customer has a 40-core E880 with 2TB of memory installed with 10 cores and lTB of memory activated. They want to move a Linux application from their x86 environment to the E880 The application is supported on Linux on Power and requires 8 cores and 64GB of memory. The Linux team is unfamiliar with the Power hardware.

Which of the following should be proposed to add the additional resources at the lowest cost?
A . Purchase 2 IFLs and add them to the default processor pool.
B . Purchase an additional 8 cores and 64GB of memory.
C . Purchase 2 IFLs and 64GB of memory activations.
D . Purchase 2 IFLs and isolate them in a shared processor pool.

Answer: D

Leave a Reply

Your email address will not be published.