Which two actions should you perform?

Posted by: Pdfprep Category: 300-160 Tags: , ,

You have a Cisco UCS B-Series Blade Server chassis connected, which has four 10-Gbps connections to Cisco UCS Fabric Interconnect A. You plan to deploy a blade that has ESXi installed. You must provide a dedicated 10-Gbps uplink to the blade.

Which two actions should you perform? (Choose two.)

A. Configure a port channel between the Fabric Interconnect and the IOM.

B. Implement a QoS policy that has a policy bandwidth and assign the policy to a server profile.

C. Configure static pining to the uplink port in the server profile.

D. Configure dynamic pinning to the uplink port in the server profile.

E. Configure a vPC between the Fabric Interconnect and the IOM.

Answer: AB

Leave a Reply

Your email address will not be published.