You are deploying a cluster with four AFF A300 nodes and Cisco 3232C switches. When you arrive at the customer’s site, you notice that there are multiple breakout cables and four Cisco 3232C switches. In this scenario, which statement is true?

Posted by: Pdfprep Category: NS0-183 Tags: , ,

You are deploying a cluster with four AFF A300 nodes and Cisco 3232C switches. When you arrive at the customer’s site, you notice that there are multiple breakout cables and four Cisco 3232C switches. In this scenario, which statement is true?
A . A 4-node AFF A300 cluster requires four Cisco 3232C switches.
B . Cisco best practices require four Cisco 3232C switches for high availability.
C . A 4-node AFF A300 cluster requires two Cisco 3232C switches for the cluster interconnect and two for management.
D . Your customer ordered a MetroCluster IP configuration.

Answer: D

Leave a Reply

Your email address will not be published.