9000 series Switch are true?

Posted by: Pdfprep Category: 350-601 Tags: , ,

Which two statements about the process of performing an EPLD upgrade on a Cisco MDS

9000 series Switch are true? (Choose two.)
A . If an upgrade is interrupted, the upgrade continues after a connection is restored.
B . The upgrade can be performed from the standby supervisor module.
C . The active supervisor can be upgraded.
D . Modules must be online to be upgraded.
E . The Upgrade process disrupts only the module that is being upgraded.

Answer: D,E

Explanation:

https://www.cisco.com/c/en/us/td/docs/switches/datacenter/mds9000/sw/8_x/release_notes /epld/epld_rn_8x.html

Leave a Reply

Your email address will not be published.