Following are some of the recognized risks which cannot be managed by inspection alone except one

Posted by: Pdfprep Category: API-580 Tags: , ,

Following are some of the recognized risks which cannot be managed by inspection alone except one
A . Equipment nearing retirement
B . Failure mechanisms (such as brittle fracture, fatigue) where avoidance of failure primarily depends on operating within a defined pressure/temperature envelope
C . Consequence-dominated risks
D . The suitability and current condition of the equipment within the current operating envelope will determine the probability of failure (pof) of the equipment from one or more deterioration mechanisms

Answer: D