What may be a cause of this?

Posted by: Pdfprep Category: E20-597 Tags: , ,

An EMC NetWorker administrator notices that clients are being backed up one at a time, even though they are scheduled to start simultaneously.

What may be a cause of this?
A . Server parallelism is set to 1
B . There is only one volume labeled
C . Client parallelism is set to 1
D . There is only one pool configured

Answer: A

Leave a Reply

Your email address will not be published.