When the maintenance engineer arrives at the customer site, the working environment around the site should be recorded. The main collection items are (). (Multiple choice)

Posted by: Pdfprep Category: H12-425-ENU Tags: , ,

When the maintenance engineer arrives at the customer site, the working environment around the site should be recorded. The main collection items are (). (Multiple choice)
A . Ventilation
B . Ambient temperature
C . Equipment installation distance
D . If there is a bad environment around it (such as dust or moisture)

Answer: ABCD

Leave a Reply

Your email address will not be published.