Which of the following is the aggregate risk impact on the accounting system?

Posted by: Pdfprep Category: CAS-001 Tags: , ,

An administrator is assessing the potential risk impact on an accounting system and categorizes it as follows:

Administrative Files = {(Confidentiality, Moderate), (Integrity, Moderate), (Availability, Low)}

Vendor Information = {(Confidentiality, Moderate), (Integrity, Low), (Availability, Low)}

Payroll Data = {(Confidentiality, High), (Integrity, Moderate), (Availability, Low)}

Which of the following is the aggregate risk impact on the accounting system?
A . {(Confidentiality, Moderate), (Integrity, Moderate), (Availability, Moderate)}
B . {(Confidentiality, High), (Integrity, Low), (Availability, Low)}
C . {(Confidentiality, High), (Integrity, Moderate), (Availability, Low)}
D . {(Confidentiality, Moderate), (Integrity, Moderate), (Availability, Low)}

Answer: C