Which of the following requirements did the testing plan confirm?

Posted by: Pdfprep Category: CV0-002 Tags: , ,

The outputs of the old and new applications were compared side by side.

Which of the following requirements did the testing plan confirm? (Select two.)
A . High availability
B . Performance
C . Connectivity
D . Data integrity
E . Sizing
F . Security

Answer: B,D