An external refurbishment is initiated by __________. (Choose three.)

Posted by: Pdfprep Category: C_TS413_1809 Tags: , ,

An external refurbishment is initiated by __________. (Choose three.)
A . Setting the subcontracting indicator within the external operation
B . Simply choosing an adequate order type
C . Creating an externally processed operation with control key PM02
D . Setting the material provision indicator of the component to Rework Material

Answer: ACD