Which of the following would be used to determine the scope of the change on the product?

Posted by: Pdfprep Category: PMI-PBA Tags: , ,

A stakeholder wants to modify an existing feature.

Which of the following would be used to determine the scope of the change on the product?
A . Project schedule and cost baseline
B . Requirements attributes table
C . Requirements traceabihty matrix
D . Sequence diagram

Answer: C