Which of the following is MOST critical to the design of relevant risk scenarios?

Posted by: Pdfprep Category: CRISC Tags: , ,

Which of the following is MOST critical to the design of relevant risk scenarios?
A . The scenarios are linked to probable organizational situations.
B . The scenarios are based on past incidents.
C . The scenarios are aligned with risk management capabilities.
D . The scenarios are mapped to incident management capabilities.

Answer: A