Which of the following serves as a guiding principle for a program manager when preparing a program work breakdown structure?

Posted by: Pdfprep Category: PgMP Tags: , ,

Which of the following serves as a guiding principle for a program manager when preparing a program work breakdown structure?
A . Decompose the program work based upon available resources
B . Decompose the program to the work package level
C . Decompose the program to the architecture baseline level
D . Decompose the program at a level sufficient to achieve control

Answer: A